before
after
Job Type
REMODELING – Framing, drywall, finish carpentry, paint
Problems
Mike needed a new basement master bedroom and closet
Solution
- First we added some framing and a new door for a closet and then hung sheetrock along with tape and mud
- Next we removed all existing trim that was outdated and replaced it with new trim as well as adding crown mouldings in the bedroom
- Once the finish carpentry was finished we prepped and painted the bedroom and closet
Timeline
This remodel took 2 weeks
Colors used
- Apple peel(white) for trim and ceilings
- Desert Beige for walls
- Used same colors to match the rest of the home